|
Statewide Work Zones
Counties:
|
|
|
|
|
|
|

Let us know how we can improve. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
| |
|
|
All work subject to change due to weather or priority adjustments. Motorists are urged to exercise caution while passing through work zones. Workers may be on or near the roadway. Signs will be posted and flag persons will be present in areas where traffic will be impacted. Please contact the MoDOT Customer Service Center by calling the toll-free number 1.888.ASK.MoDOT (275.6636).
Receive FREE email updates
PDF File: Week of July 26th
Return to top
Interstate 44
Pulaski County
Interstate 44:
Contractor survey crews will be working. Workers and equipment will be located on or near the roadway while
performing work to improve driveways and approaches.
Location: WEST BOUND - From mile marker 163 to mile marker 153.
Interstate 44:
MoDOT crews will perform vegetation control on the right-of-way, which improves sight distance.
Location: Crews will be spraying ramps from the intersection of Route 28 to the intersection of
Route 133.
Carter County
Roadway Maintenance
Carter County & Shannon County
Contractor Crews
Route 60:
Contractor crews will be constructing shoulder. While performing this function, crews and equipment
are located directly on or near the roadway. Motorists are urged to exercise caution when moving
through the work zone.
Location: From the intersection of Route C in Carter County to the intersection of Route U in
Shannon County.
Crawford County
Roadway Maintenance
Route 19:
MoDOT crews will perform edge rut repair work, which requires placing material at the edge of the
roadway and is necessary to reduce shoulder drop off. While performing this function, crews and
equipment are located directly on or near the roadway. Motorists are urged to exercise caution when
moving through the work zone.
Location: From Cuba, Mo city limits to the north intersection of Old Route 19.
Route M:
MoDOT crews will do bridge maintenance to improve the section where the road and bridge meet
and prevent deterioration of the bridge deck or structure.
Location: The bridge located over the Meramec River.
Return to top
Crawford County & Phelps County
Roadway Maintenance
Route NN:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing
this function, crews and equipment are located directly on the roadway. Motorists are urged to
exercise caution when moving past the work zone.
Location: From the intersection of Route 68 to the end of state maintenance in Crawford County.
Dent County
Roadway Maintenance
Route F:
MoDOT crews will be replacing drainage pipes near the roadway. Pipes periodically need replacing to maintain proper drainage.
Location: From the intersection of Route 32 to the intersection of Route E.
Dent County & Texas County
Roadway Maintenance
Route VV:
MoDOT crews will be replacing drainage pipes near the roadway. Pipes periodically need replacing to maintain proper drainage.
Location: From the intersection of Route 119 in Dent County to the intersection of Route 137 in Texas County.
Howell County
Roadway Maintenance
Business Route 63:
MoDOT crews will perform concrete replacement work to maintain a smooth pavement surface.
While performing this function, crews and equipment are located directly on the roadway. Following
the concrete repair, drying time is necessary and the lane will remain closed until this process has
occurred. Motorists are urged to exercise caution when moving through the work zone.
Location: BUSINESS Route from the intersection of Missouri Ave. to the intersection of Porter
Wagner Blvd.
Howell County & Oregon County
Roadway Maintenance
Route 160:
MoDOT crews will perform chip-seal resurfacing on roads that are in generally fair to better
condition. The benefits include crack sealing, increased skid resistance and correction of minor
rutting, which extends the life of the pavement in a cost effective way. Motorists should plan ahead
and allow extra time due to a one-lane restriction. Work zone signs, flag persons and a pilot vehicle
will be used during this operation. MoDOT urges motorists to proceed slowly through the work zone,
especially while driving on the fresh-laid surface.
Location: From West Plains, Mo. city limits in Howell County to the intersection of Route 99 in
Oregon County.
Howell County & Ozark County
Roadway Maintenance
Route KK:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing
this function, crews and equipment are located directly on the roadway. Motorists are urged to
exercise caution when moving past the work zone.
Location: From the intersection of Route K in Howell County to the end of state maintenance in
Ozark County.
Howell County & Texas County
Roadway Maintenance
Route 60:
MoDOT crews will perform concrete replacement work to maintain a smooth pavement surface.
While performing this function, crews and equipment are located directly on the roadway. Following
the concrete repair, drying time is necessary and the lane will remain closed until this process has
occurred. Motorists are urged to exercise caution when moving through the work zone.
Location: From the intersection of Route AM in Howell County to the intersection of Route 181 in
Texas County.
Return to top
Iron County
Roadway Maintenance
Route 21:
MoDOT crews will do bridge maintenance to improve the section where the road and bridge meet
and prevent deterioration of the bridge deck or structure.
Location: The bridge located over Carver Creek.
Return to top
Oregon County
Roadway Maintenance
Route 99:
MoDOT crews will perform chip-seal resurfacing on roads that are in generally fair to better
condition. The benefits include crack sealing, increased skid resistance and correction of minor
rutting, which extends the life of the pavement in a cost effective way. Motorists should plan ahead
and allow extra time due to a one-lane restriction. Work zone signs, flag persons and a pilot vehicle
will be used during this operation. MoDOT urges motorists to proceed slowly through the work zone,
especially while driving on the fresh-laid surface.
Location: From the intersection of Route 160 to the intersection of Route T.
Oregon County & Shannon County
Roadway Maintenance
Route 99:
MoDOT crews will perform chip-seal resurfacing on roads that are in generally fair to better
condition. The benefits include crack sealing, increased skid resistance and correction of minor
rutting, which extends the life of the pavement in a cost effective way. Motorists should plan ahead
and allow extra time due to a one-lane restriction. Work zone signs, flag persons and a pilot vehicle
will be used during this operation. MoDOT urges motorists to proceed slowly through the work zone,
especially while driving on the fresh-laid surface.
Location: From the intersection of Route T in Oregon County to the intersection of Route 60 in
Shannon County.
Return to top
Phelps County
Contractor Crews
Route BB:
Contractor crews will asphalt milling. One lane traffic with flaggers and speed limit is reduced to 35
MPH. While performing this function, crews and equipment are located directly on the roadway.
Motorists are urged to exercise caution when moving through the work zone.
Location: From the intersection of Forum Drive in Rolla, Mo. to the intersection of Route 68 in St.
James, Mo.
Route KK:
Contractor crews will asphalt overlay with milling. One lane traffic with flaggers and speed limit is
reduced to 35 MPH. While performing this function, crews and equipment are located directly on the
roadway. Motorists are urged to exercise caution when moving through the work zone.
Location: From the intersection of Route 8 in St. James to the Crawford County line.
Roadway Maintenance
Route D:
MoDOT crews will be paving over the roadway surface to restore a smooth ride. While performing
this function, crews and equipment are located directly on the roadway. Motorists are urged to
exercise caution when moving past the work zone.
Location: The Gasconade River bridge approach near Interstate 44 at Jerome, Mo. city limits.
Route M:
MoDOT crews will do bridge maintenance to improve the section where the road and bridge meet
and prevent deterioration of the bridge deck or structure.
Location: The bridge located over Corn Creek.
Pulaski County
Contractor Crews
Interstate 44:
Contractor survey crews will be working. Workers and equipment will be located on or near the roadway while performing work to improve driveways and approaches.
Location: WEST BOUND - From mile marker 163 to mile marker 153.
Roadway Maintenance
Interstate 44:
MoDOT crews will perform vegetation control on the right-of-way, which improves sight distance.
Location: Crews will be spraying ramps from the intersection of Route 28 to the intersection of Route 133.
Route BB:
MoDOT crews will be paving over the roadway surface to restore a smooth ride. While performing this function, crews and equipment are located directly on the roadway. Motorists are urged to exercise caution when moving past the work zone.
Location: From the intersection of Route 133 to the intersection of Route U.
Routes 7, AA, T, and Y:
MoDOT crews will perform edge rut repair work, which requires placing material at the edge of the roadway and is necessary to reduce shoulder drop off. While performing this function, crews and equipment are located directly on or near the roadway. Motorists are urged to exercise caution when moving through the work zone.
Location: The entire routes.
Route TT:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorists are urged to exercise caution when moving past the work zone.
Location: From the intersection of Route AW to the end of state maintenance.
Various Routes:
MoDOT crews will replace, install and or maintain roadway signs. While performing this function, crews and equipment are located directly on or near the roadway. Motorists are urged to exercise caution when moving through the work zone.
Return to top
Reynolds County
Roadway Maintenance
Return to top
Ripley County
Roadway Maintenance
Route 142:
MoDOT crews will perform vegetation control on the right-of-way, which improves sight distance.
Location: From the intersection of Route 21 South to the Oregon County line.
Route 160:
MoDOT crews will perform vegetation control on the right-of-way, which improves sight distance.
Location: From the intersection of Route 21 South to the Oregon County line.
Route P:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing
this function, crews and equipment are located directly on the roadway. Motorists are urged to
exercise caution when moving past the work zone.
Location: The location is 1 mile north of the Route DD intersection.
Return to top
Shannon County
Roadway Maintenance
Return to top
Texas County
Contractor Crews
Route 63:
Contractor crews will replace the decks of these two bridges.
Location: The location over Arthur and Bender Creeks are part of The Safe and Sound project. Traffic is controlled by signal devices. This area is known to locals as Twin Bridges.
Roadway Maintenance
Route 60:
MoDOT crews will perform concrete replacement work to maintain a smooth pavement surface. While performing this function, crews and equipment are located directly on the roadway. Following the concrete repair, drying time is necessary and the lane will remain closed until this process has occurred. Motorists are urged to exercise caution when moving through the work zone.
Location: EAST BOUND ON RAMP (Business 63) from the first Cabool, Mo. exit onto Route 60. Traffic will be routed to the shoulders.
Route M:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorists are urged to exercise caution when moving past the work zone.
Location: From the intersection of Route 32 to the intersection of Route MM.
Return to top
Washington County
Roadway Maintenance
Route 185:
MoDOT crews will do bridge maintenance to improve the section where the road and bridge meet
and prevent deterioration of the bridge deck or structure.
Location: The bridge located over Indian Creek.
Route 47:
MoDOT crews will perform chip-seal resurfacing on roads that are in generally fair to better
condition. The benefits include crack sealing, increased skid resistance and correction of minor
rutting, which extends the life of the pavement in a cost effective way. Motorists should plan ahead
and allow extra time due to a one-lane restriction. Work zone signs, flag persons and a pilot vehicle
will be used during this operation. MoDOT urges motorists to proceed slowly through the work zone,
especially while driving on the fresh-laid surface.
Location: From the intersection of Route 21 to the St. Francois County line.
Route U:
MoDOT crews will do bridge maintenance to improve the section where the road and bridge meet
and prevent deterioration of the bridge deck or structure.
Location: The bridge located over Big River.
Route U:
MoDOT crews will perform chip-seal resurfacing on roads that are in generally fair to better
condition. The benefits include crack sealing, increased skid resistance and correction of minor
rutting, which extends the life of the pavement in a cost effective way. Motorists should plan ahead
and allow extra time due to a one-lane restriction. Work zone signs, flag persons and a pilot vehicle
will be used during this operation. MoDOT urges motorists to proceed slowly through the work zone,
especially while driving on the fresh-laid surface.
Location: From the intersection of Route 8 to the intersection of Route M.
Route U:
MoDOT crews will perform concrete replacement work to maintain a smooth pavement surface.
While performing this function, crews and equipment are located directly on the roadway. Following
the concrete repair, drying time is necessary and the lane will remain closed until this process has
occurred. Motorists are urged to exercise caution when moving through the work zone.
Location: From the intersection of Route 8 to one half mile south of the Route U and Route 8
intersection.
Return to top
|