Other Modes Other Transportation Facebook, Twitter, Blog, YouTube, Podcast, Widgets
Our mission is to provide a world-class transportation experience that delights our customers and promotes a prosperous Missouri.

Missouri Highways and Transportation Commission
Career Opportunities
Project Bid Opening Info
Contact Us
Map Request
MoDOT Express Lane
Motor Carrier Services
MoDOT
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888 ASK MODOT
(1-888 275 6636)
High Speed Intercity Passenger Rail
 

2009 Applications


Missouri Receives Millions for High-Speed Rail Projects

Missouri was awarded $31 million for high-speed rail projects under the American Recovery and Reinvestment Act. These funds will be used to build capacity and reliability on the St. Louis to Kansas City rail corridor. High speed rail applications receiving approval include all three Track 1a projects listed below. The award will also fund preliminary engineering on all Track 1b projects except the 3rd mainline track in the Jefferson City yard. Real-time passenger information displays were also not funded.


MoDOT's 2009 HSIPR Preapplications

Preapplications for high speed rail funds for the Union Pacific route between St. Louis and Kansas City were filed by MODOT on July 6, 2009 with the Federal Railroad Administration. The preapplications give a very general outline of each project proposed which were then further refined in a later final application for each project.


Application Summary for Track 1a & 1b Submittals

Final applications for high speed rail funds for the Union Pacific route between St. Louis and Kansas City were filed by MODOT on August 22, 2009 with the Federal Railroad Administration. The final applications are split into two categories. The 3 "Track 1a" projects give an extremely detailed description of each project proposed and a proposed construction schedule for each of the 3 "shovel ready" projects. The 8 "Track 1b" projects give a less-detailed description of each project as those projects still need to have preliminary engineering and environmental clearances completed for them.



Track 1a Projects

  1. 2nd Rail Bridge over Osage River - Approved
  2. Missouri Rail Crossing Safety Improvements - Approved
  3. Webster Universal Crossover - Approved


Track 1b Projects

  1. Bonnots Mill Universal Crossover
  2. Knob Noster Passing Siding Extension
  3. Hermann Universal Crossover
  4. 3rd Mainline Track in Jefferson City Yard
  5. Kingsville Passing Siding
  6. Strasburg Grade Separation
  7. Double Track Lee's Summit to Pleasant Hill
  8. Real-Time Passenger Information Displays

MoDOT received preliminary design and environmental money for 90mph double track from Lee's Summit to Pleasant Hill, Kingsville Siding, Knob Noster Siding, Strasburg Grade Seperation, and the Universal Crossover at Hermann and Bonnots Mill.


Application Summary for Track 2 Submittal

Track 2 Project

  1. New Locomotive and Passenger Equipment



2010 Applications

Application for FRA FY 2010 Planning Funds

Final applications for FY 2010 Planning funds for the Missouri State Rail Plan were filed by MODOT on May 19, 2010 with the Federal Railroad Administration. The final applications give a detailed description of the proposed project.

 

The documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon

   
   
   
   
FlikcrFlickr WidgetsPodcastYouTubeBlogTwitter Facebook Twitter Blog YouTube Podcast Widgets Facebook